Surplus Boilers125 HP OS 15 PSI150 HP Parker 125 PSI200 HP Clayton350 HP Hotwater CB boiler500 HP Hotwater Superior500 HP Ind/CB600 HP Kewanee - 150 PSI 660 HP Wood boiler40 kpph C-B 350 P40 kpph Keeler Wmsport80 kpph CE/Holman 100,000 pph Nebraska - 250 P150 kpph Keeler -150 PSI150,000 pph Zurn - 1050 P250 kpph Volcano  750 P Contact US150,000 pph NebraskaRental Boilers2 - 40 kpph Keeler 250 Poil well steam150 kpph 1100/850500 HP Wood fired boilerOtherOtherOtherOtherOtherOtherOtherOtherOtherOtherOtherOther

 

BOILER   LIQUIDATION
NEW UNUSED PRESSURE COMPONENTS
700,000 pph circulating fluid bed boiler parts
1250 PSIA
1,000 F superheat
Designed to burn 8,400 btu coal.
Will incinerate 120,000 pph of off gas from external source
Fuel: Designed for Powder River Basin 8,400 btu coal but can be modified for
     different types of fuel such as bituminous coal,  biomass, TDF or blended fuels.
Lead time: Pressure parts available immediately
The design is complete, but only the pressure parts have been purchased and fabricated. Design changes can be made to facilitate the unique needs of the Buyers facility. The contract for the balance of the plant will be renegotiated with the OEM to meet the scope, requirements, performance guarantees, etc. as required by the Buyer.


1 EEI CFB Boiler
2 Fabricated Pressure Parts
3. Blank
4. Part of description
5 Furnace Upper front wall                                                                                                  
6 Furnace Upper rear wall
7 Furnace Upper right sidewall with header
8 Furnace Upper left sidewall with header
9 Furnace Lower right sidewall with headers
10 Furnace Lower left sidewall with headers
11 Furnace Lower front sidewall with header
12 Furnace Lower rear wall with header
13 Furnace Roof with header
14 Furnace Division wall
15 Furnace Floor with header and air nozzles
16 Furnace Headers of hanger tubes
17 Furnace Inlet duct openings from furnace rear wall to cyclone
18 Furnace Buckstays
19 Superheater Primary Superheater 1/2/3 elements
20 Superheater Headers for Primary Superheater
21 Superheater Elements of Final Superheater 1/2
22 Superheater Headers for Final Superheater
23 Superheater Secondary Superheater elements
24 Back Pass Frontwall with headers
25 Back Pass Rearwall with headers
26 Back Pass Sidewall (Left) with headers
27 Back Pass Sidewall (Right) with headers
28 Back Pass Roof Panels
29 Back Pass Hanger tubes
30 Back Pass Buckstays and support beams
31 Cyclone Upper cyclone with ring header
32 Cyclone Lower cyclone with ring header
33 Cyclone Buckstays
34 Economizer Headers of Economizer
35 Economizer Elements of Economizer 5
36 Loopseals Loopseals
37 Loopseals Buckstays
38 Evaporator Evaporator wingwall with headers
END

                                                  


Curt Stauffer
330-518-3868
requestsurplus@Gmail.com





|Surplus Boilers| |125 HP OS 15 PSI| |150 HP Parker 125 PSI| |200 HP Clayton| |350 HP Hotwater CB boiler| |500 HP Hotwater Superior| |500 HP Ind/CB| |600 HP Kewanee - 150 PSI | |660 HP Wood boiler| |40 kpph C-B 350 P| |40 kpph Keeler Wmsport| |80 kpph CE/Holman | |100,000 pph Nebraska - 250 P| |150 kpph Keeler -150 PSI| |150,000 pph Zurn - 1050 P| |250 kpph Volcano 750 P | |Contact US| |150,000 pph Nebraska| |Rental Boilers| |2 - 40 kpph Keeler 250 P| |oil well steam| |150 kpph 1100/850| |500 HP Wood fired boiler| |Other| |Other| |Other| |Other| |Other| |Other| |Other| |Other| |Other| |Other| |Other| |Other|